Day

March 30, 2012
Traditional methods such as design-bid-build and even “newer” methods such as design-build are not fully collaborative. The net result is information is not shared by all parties and adversarial components of these methods typically lead to mistrust and waste. Integrated project delivery (IPD) and Job order contracting (JOC), the later also referred to as “IPD-lite”...
Continue Reading