In October, our CMO, Peter Cholakis, was invited to present at the Pentagon to the Washington Headquarters Services Facilities Services Directorate (WHS-FSD). WHS-FSD supports approximately 64,000 civilian and military personnel, including the Office of the Secretary of Defense, Joint Chiefs of Staff, Defense Agencies, and the military departments in the National Capital Region. It provides...Continue Reading
There are several ways to organize estimates. A very small project can be organized using one estimate, while a large project may require up to 10 or even 15 estimates. In the case of 4Clicks’ Project Estimator users, most have multi-year contracts (3 to 5 years in duration). During a multi-year contract, many projects may...Continue Reading
While accurate, timely, and transparent cost estimating is critical to the success of any renovation, repair, sustainability, or new construction project, most construction cost estimators (over 55%) continue to rely primarily upon manual methods, hard copy documents, or electronic spreadsheets such as Microsoft Excel. Lack of robust business processes, management practices, proper education and training,...Continue Reading
Traditional methods such as design-bid-build and even “newer” methods such as design-build are not fully collaborative. The net result is information is not shared by all parties and adversarial components of these methods typically lead to mistrust and waste. Integrated project delivery (IPD) and Job order contracting (JOC), the later also referred to as “IPD-lite”...Continue Reading
1. Buildings account for almost 40 percent of primary energy use in the United States, 12 percent of total water use, and 60 percent of all non-industrial waste. Indoor environmental quality of buildings affects the health, safety, and productivity of the people who occupy them. 2. The U.S. federal government has the opportunity, and the...Continue Reading